I-5 Beltline Interchange

Move your mouse over the left side thumbnails to change the main image

Client/Owner: Oregon Department of Transportation
Location: Eugene, Oregon
Cost: $48,500,000 (Total Contract Value)

This project consists of five bridges, eleven retaining walls, five privacy walls, one three sided culvert, asphaltic concrete, continuously reinforced concrete paving, and demolition of two existing bridges on I-5.  The fly-over is a 2,066 foot long post-tensioned cast-in-place parabolic box girder bridge, consisting of ten spans.  3,433 m of 24” steel pipe pile are included in the foundation of this fly-over.   In addition to the fly-over permanent pile, there were over 300 falsework piles, 40 piles for the detour structure, and 170 permanent piles for three separate structures, including a stay cable rod pedestrian bridge over I-5. In total more than 900 piles totaling over 45,000 LF in length were required.